Whether a plot may be built on, how high, how densely and for which use is determined by public building law. We support clients and investors through the permit procedure and represent them before authorities and administrative courts.
Structure of public building law
Planning law is federal law. It derives mainly from the German Building Code (BauGB) and the Land Use Ordinance (BauNVO) and governs which uses are permissible where:
- within the scope of a development plan (section 30 BauGB), if the project complies with its provisions
- in built-up areas without a development plan (section 34 BauGB), if it fits into the character of the immediate surroundings
- in outlying areas (section 35 BauGB) only for privileged projects – such as agriculture or renewable energy – or exceptionally, if public interests are not impaired
Building regulations are state law – in Lower Saxony the Lower Saxony Building Code (NBauO). They govern setback areas, fire protection, structural stability, parking spaces, accessibility and the permit procedure. As we work nationwide, we advise on the basis of all state building codes.
The permit procedure
- Preliminary building enquiryBinding clarification of individual questions, such as admissibility under planning law, before the time-consuming building application.
- Simplified procedureLimited scope of review for many residential buildings; the client remains responsible for compliance with the other provisions.
- Standard procedureComprehensive review, particularly for special buildings such as places of assembly, high-rise buildings or large retail outlets.
- Exemption from the permit requirementNo procedure for certain projects within a development plan area – with the client bearing its own responsibility.
The building application includes, among other things, construction drawings, a building description, a site plan, structural and fire protection certificates and proof of access to infrastructure. Where provisions are deviated from, exceptions, exemptions and deviations may be considered. The building permit is time-limited; in Lower Saxony it lapses if construction does not start within three years.
Legal protection
If the building application is refused or only granted with onerous conditions, an objection – where provided for by state law – and an action for issue of a permit before the administrative court are possible. In Lower Saxony, the objection procedure has been abolished for most building law decisions; an action must be filed within one month. If the authority fails to act, an action for failure to act may be considered.
Building control measures
The building control authority can intervene in the event of breaches: through a stop-work order, a prohibition of use or a demolition order. Such orders are often immediately enforceable. Quick action with an urgent application to the administrative court is then required. Legalisation through a retrospective building application can often be achieved.
Environmental and heritage protection
Depending on the project, requirements under nature conservation, emission control, water and heritage protection law must be observed – such as species protection surveys, noise forecasts or heritage permits for work on listed buildings and in their surroundings.
Our services
- Assessing buildability and approvability before buying land
- Preliminary enquiries and support during the permit procedure, coordination with authorities
- Exemptions, exceptions and deviations
- Objections, actions and urgent proceedings
- Defending against stop-work orders, prohibitions of use and demolition orders
- Defending permits granted against neighbour actions
Case studies
Change of use approved
Situation: An owner wanted to convert an empty shop into a medical practice; the city demanded additional parking spaces.
Approach: We negotiated a payment in lieu of parking spaces and set out why the project was approvable.
Outcome: The change of use was approved.
Demolition order averted
Situation: The building control authority demanded the demolition of a garage that had existed for decades.
Approach: We proved protection of the existing structure and submitted documents from the building archive.
Outcome: The authority revoked the order.
Outline decision before buying land
Situation: An investor only wanted to buy a plot in an unplanned built-up area if four full storeys were possible.
Approach: We filed a preliminary building enquiry with reference to the surrounding buildings.
Outcome: The positive outline decision secured the purchase decision.
The examples are anonymised and simplified. They illustrate typical situations; every case is different, and no particular outcome can be promised.
Frequently asked questions
How long does a building permit procedure take?
That depends on the project, the completeness of the documents and the authority’s workload. The state building codes contain processing deadlines, but in practice procedures often take several months. Early coordination with the building control authority and complete documents speed up the procedure considerably.
What can I do against a demolition order?
First check the deadline in the information on legal remedies. Against an immediately enforceable demolition order, an application can be made to the administrative court to restore suspensive effect. At the same time, it should be examined whether the project can be approved retrospectively or enjoys protection as an existing structure.
May I start building before the permit has been granted?
No. Starting construction early is a regulatory offence and can lead to a stop-work order and a fine. Separate waiting periods apply to projects exempt from the permit requirement.
Last updated: · horak Rechtsanwälte, Hanover. General information under German law, not legal advice in an individual case.